Design-Build Featured,

Keytesville, MO

Constructed a new retail ag location. Included in said location are:

  • 4,000 ton Fertilizer Building
  • 16,000 square foot Chemical Facility
  • 7,700 square Seed Facility
  • Anhydrous Ammonia Bulk Plant
  • 6,000 square foot Equipment Storage Building

Building by – Pre-Engineered Butler Building

Building by – Pre-Engineered Lester Building

Surveying- Cleaver & Associates

Engineering – Klingner & Associates

Concrete by – Randolph County Foundation Company

Erection Labor – 12-D Construction

Electric and Data – Harlan Electric

Seed Treating Equipment – KSI

Fertilizer Equipment – Adams Equipment

Anhydrous Equipment – Dibble

Plumbing – Tucker Plumbing and Heating

HVAC- Kenny Bragg HVAC

Overhead Doors – Glenn’s Garage Doors