Design-Build Featured,
Keytesville, MO
Constructed a new retail ag location. Included in said location are:
- 4,000 ton Fertilizer Building
- 16,000 square foot Chemical Facility
- 7,700 square Seed Facility
- Anhydrous Ammonia Bulk Plant
- 6,000 square foot Equipment Storage Building
Building by – Pre-Engineered Butler Building
Building by – Pre-Engineered Lester Building
Surveying- Cleaver & Associates
Engineering – Klingner & Associates
Concrete by – Randolph County Foundation Company
Erection Labor – 12-D Construction
Electric and Data – Harlan Electric
Seed Treating Equipment – KSI
Fertilizer Equipment – Adams Equipment
Anhydrous Equipment – Dibble
Plumbing – Tucker Plumbing and Heating
HVAC- Kenny Bragg HVAC
Overhead Doors – Glenn’s Garage Doors