Featured Wood Frame Buildings, Wood Frame Buildings,

Fertilizer & Load Out Buildings

Paris, MO

Constructed a new fertilizer building with a load out building. Included in said location are:

  • Pre-Engineered Lester Building
  • 13,260 square feet of storage
  • 80′ x 45′ load out building
  • Stair way and catwalk above bins with conveyor support
  • 8 – 20′ bins
  • Mechanical Room
  • Control Room

Building by – Pre-Engineered Lester Building

Concrete by – Randolph County Foundation Company

Erection Labor by- 12-D Construction

Electric by – Harlan Electric and Controls

Floor Heat by – Kenny Bragg HVAC

Overhead Doors by- Glenn’s Garage Doors

Site Work by – Schwada Builder’s, Inc.