Featured Wood Frame Buildings, Wood Frame Buildings,
Fertilizer & Load Out Buildings
Paris, MO
Constructed a new fertilizer building with a load out building. Included in said location are:
- Pre-Engineered Lester Building
- 13,260 square feet of storage
- 80′ x 45′ load out building
- Stair way and catwalk above bins with conveyor support
- 8 – 20′ bins
- Mechanical Room
- Control Room
Building by – Pre-Engineered Lester Building
Concrete by – Randolph County Foundation Company
Erection Labor by- 12-D Construction
Electric by – Harlan Electric and Controls
Floor Heat by – Kenny Bragg HVAC
Overhead Doors by- Glenn’s Garage Doors
Site Work by – Schwada Builder’s, Inc.